KOC LFHO

Project : KOC Lower Fars Heavy Oil Development Program Phase 1
Alghanim Role : As a General Construction Contractor – Buildings on EPC basis,
CMEI construction of complete infield Satellite Station (ISS)
Client : KOC / Petrofac
Project Value : USD 280 Million (EPC)
Scope of work
  • Buildings
    – Blast Resistance : 12nos – 9196 m2
    – Non Blast : 31 nos – 21289 m2
  • Civil – Site Preparation : 151,948 m2
  • Excavation : 242,959 m3
  • Backfilling : 45,216 m3
  • RCC (in-situ) : 27,311 m3
  • Precast) : 23830 m3
  • Str. Steel – Erection : 3418 Tons
  • Piping – Fabrication : 294,912 inch dia
  • Erection
    – 399,837 inch dia
    – 2,683,697 inch meter
    – Static Eqpt : 365 Tons
    – Rotary Eqpt : 192 Tons
    – Elec. Cable : 1,346,870 meter
    – Inst. cable : 1,407,219 meter