Interim Road Improvement - Doha South Phase 1

The project area comprises of the Al Wukair community divided by Wukair Street which was originally part of the Expressway Program. The overall project area is predominantly a residential community spread over an area of approximately 2300 hectares.

The overall project includes the infrastructure of around 9726 residential plots, 1600 commercial plots, 4 schools, 3 reserved government plots, 21 mosques, 13 parks and 226 open space / green areas part of which is the Interim Road Improvement of Doha South Phase 1.

General Scope of Works includes the following elements:

  • General site clearance and demolition works.
  • Earthworks.
  • Roadworks inclusive of flexible pavements, precast concrete block pavements, tactile pavements, speed tables and dust control.
  • Passive and active traffic management inclusive of traffic signs, road markings, traffic signals and traffic signal controller.
  • Ducts and chambers for the Intelligent transportation systems (ITS) as per the national ITS strategy.
    Street lighting.
  • Surface water and groundwater drainage include pipe works, gullies, catch-pits and soakaways.
    Treated sewage effluent (TSE) distribution system.
  • Utility services including potable water, electrical (LV, MV, HV & EHV) and Telecom (CRA networks) and Unified Government Network (UGN).
Client : Public Works Authority, Qatar
Consultant: AECOM
Governmental / Private: Governmental
Region: Qatar
Contract type: Conventional
Commencement: 10-June-2019
Project Value: USD 96 Million
Project Status: Ongoing